Extended Day Kindergarten:
A net gain of three classrooms, small-group instruction space, and a staff work room through expansion into the 1890s building formerly used for Board of Education offices
Added instructional space with the conversion of underutilized space
More space and separation at the Media Center shared with the Middle School
Dedicated Guidance / Counseling Suite through conversion of underutilized space
Enlarged and improved nurse’s office dedicated to elementary school students
Safer, more accessible playground with an engineered surface to replace shredded-wood mulch
New sports surface after the safe removal of the mercury-containing floor in the Multi-Purpose Room
Repaired roofing and new access ladders
Upgraded sections of interior corridors
Modern fire alarm system
$3,633,501 eligible for state aid
A net gain of three classrooms in an addition that also includes a new Media Center properly sized for the school
Added small-group instruction space
Better accessibility with the relocation of the Main Office
Dedicated space and better accessibility with the relocation of the Art Room
Dedicated space for a Music room
Improved rooms for occupational and physical therapy
A new elevator to provide accessibility to all floors
Safer, more accessible playground with an engineered surface to replace shredded-wood mulch
New sports surface after the safe removal of the mercury-containing floor in the Multi-Purpose Room
Upgraded electrical service
Repaired / improved parking areas
Repaired roofing and new access ladders
Upgraded sections of interior corridors
Modern fire alarm system
$6,262,694 eligible for state aid
An addition containing a new Media Center and a net gain of three classrooms
Additional small group instruction space
Improved rooms for occupational and physical therapy
Safer, more accessible playground with an engineered surface to replace shredded-wood mulch
New sports surface after the safe removal of the mercury-containing floor in the Multi-Purpose Room
Properly sized kitchen after expansion and updates
Upgraded electrical service
Repaired roofing and new access ladders
Upgraded sections of interior corridors
Modern fire alarm system
$3,302,422 eligible for state aid
Auditorium alterations and upgrades that include refinishing the stage, seating, lighting, sound system, curtains
Renovated music practice rooms below the stage area
More space and separation at the Media Center shared with the Middle School
Nurse’s office dedicated to middle school students through the conversion of underutilized space
Enlarged area for the cafeteria serving line in part to improve accessibility
Restored stairwell facade
Upgraded sections of interior corridors
Modern fire alarm system
$3,831,877 eligible for state aid
Enlarged and altered security vestibule with a new transaction window to improve functionality
More accessible stadium seating with a vertical platform lift
New business classroom through the conversion of the large group lecture hall (C8)
Space for a fabrication lab after the relocation of the computer lab
Auditorium renovations including refinishing the stage, adding seating, and installing new lighting, sound system and curtains
Improved dressing room area
Renovated Media Center into a collaborative learning space for modern instructional needs
New windows in both the A-Wing and C-Wing
Replacement of the historic A-Wing cupola
Additional parking
New A-Wing Gymnasium sports surface after the safe removal of the mercury-containing floor
Upgraded sections of interior corridors
Modern fire alarm system
$9,466,775 eligible for state aid
Facilities that will be used by students, youth sports, and the community
Creates 2500 sq. ft of useable space at HMHS for future growth
Relocation and restoration of the existing historic Maggie House and Carriage House
A new, competition-sized gym with an attached auxiliary gym planned for wrestling and suitable for other uses off-season. It would include separate locker rooms and restrooms for women and men, as well as a lobby area that could be used for ticket-taking or students waiting to be picked up.
Lighting for a new synthetic turf field that is already planned for this location (turf installation would be done with reserved funds independent of the bond referendum)
A new parking area for 63 cars would be established between the new gym and field and Hopkins Lane
$0 eligible for state aid